ila
|
87083c387f
|
Implement controlled app launch (T-401)
|
2026-07-19 21:10:59 +08:00 |
|
ila
|
df6c243b21
|
Preserve staging I/O failure causes (T-615)
|
2026-07-19 20:28:56 +08:00 |
|
ila
|
449b183ca3
|
Define failure handling task (T-303)
|
2026-07-18 18:04:01 +08:00 |
|
ila
|
14589abb31
|
Integrate verified installation flow (T-302)
|
2026-07-18 17:55:01 +08:00 |
|
ila
|
6575c9ad9b
|
Define installation integration task (T-302)
|
2026-07-18 17:35:11 +08:00 |
|
ila
|
9e5f3f4840
|
Define catalog signature vector task (T-614)
|
2026-07-18 16:36:31 +08:00 |
|
ila
|
20596a7de4
|
Fence installation transaction durability (T-613)
|
2026-07-18 16:28:49 +08:00 |
|
ila
|
0f69fa330e
|
Preflight ZIP central directory metadata (T-612)
|
2026-07-18 15:40:44 +08:00 |
|
ila
|
320b83d929
|
Implement unsafe icon cache diagnostics (T-611)
|
2026-07-18 15:18:29 +08:00 |
|
ila
|
e9386d26e7
|
Split Gio shell responsibilities (T-610)
|
2026-07-18 14:23:02 +08:00 |
|
ila
|
171572973b
|
Stabilize visible item snapshots (T-609)
|
2026-07-17 17:31:46 +08:00 |
|
ila
|
1b7f72e658
|
Add adapter interaction contracts (T-608)
Harness governance / validate (push) Has been cancelled
Phase 0 build gate / verify (push) Has been cancelled
|
2026-07-17 10:41:40 +08:00 |
|
ila
|
0945fe93dc
|
Route icon results through UI events (T-607)
|
2026-07-17 10:21:44 +08:00 |
|
ila
|
f1cc7308db
|
Harden icon cache concurrency (T-606)
|
2026-07-17 09:38:25 +08:00 |
|
ila
|
6fd19d0f43
|
Harden Windows package paths (T-605)
|
2026-07-16 23:56:19 +08:00 |
|
ila
|
8dad40f934
|
Implement resumable download queue (T-301)
|
2026-07-16 19:49:06 +08:00 |
|
ila
|
a52acbf926
|
Add app details and icon cache (T-204)
Harness governance / validate (push) Has been cancelled
Phase 0 build gate / verify (push) Has been cancelled
|
2026-07-16 17:22:37 +08:00 |
|
ila
|
db8d93e843
|
Build virtualized software list (T-203)
|
2026-07-16 17:10:42 +08:00 |
|
ila
|
819b1cdf88
|
Recognize local app states (T-202)
|
2026-07-16 17:00:06 +08:00 |
|
ila
|
2e21c9f327
|
Integrate validated catalog loading (T-201)
|
2026-07-16 16:52:46 +08:00 |
|
ila
|
9da72caa01
|
Prototype atomic install recovery (T-103)
|
2026-07-16 16:32:58 +08:00 |
|
ila
|
0ffeff63e1
|
Prototype secure ZIP extraction (T-102)
|
2026-07-16 16:22:45 +08:00 |
|
ila
|
0d6ed05d7e
|
Prototype signed catalog fallback (T-101)
|
2026-07-16 16:13:18 +08:00 |
|
 ilaandClaude Fable 5
|
0184595ccc
|
Add harness coding docs for SoftBox (Go + Gio dual-build)
Harness governance / validate (push) Has been cancelled
Initialize the full harness coding document set from the
harness_coding_docs template, customized for the SoftBox project:
- Vision, requirements, tech stack (modern Go 1.25 + Gio v0.10.1;
Win7 legacy Go 1.20.14 + Gio v0.6.0), architecture, coding rules
- Protocol contracts (signed catalog, package protocol v1, Ed25519
license, events, CLI) and Gio view structure
- Roadmap Phase 0-6 with 20 suggested tasks; T-001 (monorepo
skeleton) filed and ready to claim
- Agent entry points (AGENTS.md, docs/00-ai-start-here.md),
context manifest, governance scripts and tests
- Merge Go gitignore with harness rules; keep go.work tracked
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
2026-07-16 14:33:54 +08:00 |
|